FM 100-17-2 PDF

FM 100-17-2 PDF

admin

May 28, 2020

This page contains the US Army Field Manual on Mobilization, Deployment, Redeployment, Demobiliztion. 21st Century U.S. Army Pre-Positioned Land (FM ) [Department of Defense] on *FREE* shipping on qualifying offers. This is the latest . FM (FM ), Military Operations on Urbanized Terrain (MOUT) (How to Fight). 15 Aug. FM (FM ). Military FM (FM ).

Author: Zolozilkree Grozilkree
Country: Saudi Arabia
Language: English (Spanish)
Genre: Education
Published (Last): 19 October 2010
Pages: 17
PDF File Size: 17.98 Mb
ePub File Size: 17.70 Mb
ISBN: 940-7-72419-478-3
Downloads: 37370
Price: Free* [*Free Regsitration Required]
Uploader: Juzil

Once a unit draws APL equipment, it needs an area large enough to organize into unit configurations, draw and distribute combat loads, accomplish maintenance, reconcile equipment shortages, calibrate and test-fire weapons, and prepare for onward movement to the TAA. When this stage concludes, force closure is achieved.

While major end items are inventoried at the AWRSPTCMD storage facility, secondary tasks such as conducting percent inventories of equipment components, filling materiel shortages, and repairing and servicing equipment are usually postponed until unit arrival at the staging base. Provides combat ready equipment. The underlying concept of the APL program is to rapidly match deploying units with pre-positioned materiel and then move the APL-equipped forces to their assigned area of operation AO.

Global power projection provides our national leaders with the options they need to respond to potential crises. Detailed procedures are in Chapter 3. They focus on concepts, operational phases, and essential elements needed to make Army pre-positioned land operations effective. In cases where suitable SPOD facilities are unavailable, supercargo and equipment may be off-loaded onto shallow draft vessels for final movement to land. 100-172- SPOD is a seaport capable of accommodating large, deep draft, ocean-going vessels.

An underlying concept of APL is uniting airlifted personnel with pre-positioned equipment, even though some follow-on unit equipment may arrive later via sealift.

Field Manual FM 3-35.1 Army Prepositioned Operations July 2008 (FM 100-17-1 and 100-17-2)

APS are protected go-to-war assets and will not be used to improve peacetime readiness or fill unit shortages. This option requires arrival and departure seaports. Administrative issue procedures may be used for stability operations or support operations.

See FM for further redeployment information. In winkelwagen Op verlanglijstje. Historically, 10 percent of materiel sent to a theater arrives via airlift, while the remaining 90 percent arrives via sealift. From the ABS, deploying units can determine the additional equipment that they must bring from home station. Under administrative procedures, personnel inspect and repair equipment on site, they thoroughly inventory and hand receipt materiel, vehicles marshal in the vicinity of the APL site, and convoy serials depart for the TAA in orderly columns.

  CPP 45B PDF

FM Table of Contents

APS-2 Europe – Pre-positioned sets, operational project stocks, and limited war reserve sustainment stocks. In the absence of improved APOD facilities, forces may arrive through austere landing facilities via strategic air or through a combination of strategic and tactical airlift. Inventory drawn equipment, perform preventive maintenance checks and services PMCS on equipment, and move equipment to the staging base.

They provide minimum essential support to combat operations and post-mobilization training beyond the capabilities of peacetime stocks, industry, and host nation HN support.

The Army has dedicated significant priorities and resources to ensure the readiness and availability of APS. If necessary, it means fighting our way into a denied theater or creating and protecting forward operating bases. The changing world environment has led to significant changes in how the Army structures gm forces.

Employment occurs when the deploying unit begins accomplishing its assigned mission following departure from the TAA. Reviews Schrijf een review. Staging bases may be adjacent to APL sites or up to several hundred miles away in the same or a different country based on tactical, transportation, and security considerations. A nuclear, biological, and chemical NBC team should develop an operational concept to minimize unit vulnerability to attack from weapons of mass destruction and to develop specific chemical-biological defense requirements.

The supported CINC’s requirements drive deployment planning. Equipment that typically deploys with unit personnel includes to-accompany-troops TAT materiel, such as personal weapons and chemical defensive equipment CDEand not authorized pre-positioning NAP materiel. A CINC’s decision during the window of opportunity to request that the deploying forces be equipped with APL equipment has a significant impact fmm all aspects of a deployment. No single solution will succeed when confronting an adaptive adversary.

Materiel is positioned ashore and afloat for the purpose of meeting the Army’s Global Pre-positioning Strategy requirements of more than one contingency in more than one theater of operations. The IPB is a source for developing threat assessments, particularly the asymmetric threat expected during the early entry period of deployment operations.

  4N35 APPLICATION NOTE PDF

This manual serves as an azimuth to align training, planning, and execution for the Army and its role in tm projection doctrine. Het is echter in een enkel geval mogelijk dat door omstandigheden de bezorging vertraagd is. Second, quickly organize deploying forces for onward movement at a staging base in the area 100–17-2 responsibility AOR.

The unit sets consist of pre-positioned organizational equipment–end items, supplies, and secondary items–stored in unit configurations to reduce force deployment response time. A comprehensive list of organizations and responsibilities is at Appendix A.

It describes the missions, duties, and responsibilities of all parties involved in moving APS to an operational area and handing it off to designated Army units. Below are summaries of the two draw options.

It emphasizes rapidly drawing all serviceable equipment and quickly leaving the APL site for a staging base. Its credibility depends on the capability to deploy, in a timely manner, an appropriate military force capable of accomplishing the mission. The Army must retain a wide range of capabilities while significantly improving its agility and versatility. These last two methods transport equipment over rivers, canals, or 1100-17-2 waters using US Army or HN barges and other suitable watercraft.

Samenvatting This manual establishes the doctrinal framework for the Army prepositioned 100-172- APS program. SLOC closure occurs with the arrival of surge sealift. Sustainment stocks are pre-positioned in or near a theater of operations to last until resupply at wartime rates or emergency rates are established. F a joint and expeditionary Army will require versatile forces that can execute smaller, shorter duration operations without degrading its traditional vm in a major combat operation.

Therefore, Army pre-positioned materiel around the world plays a critical role in rapidly equipping forces deploying to major theater wars MTWssmaller-scale contingencies SSCsstability operations, or support operations. Power projection assets are tailored to regional requirements and send a clear signal of US commitment.